Safe, compliant, and tightly controlled removal of existing assets—planned to protect people, schedule, and the structural integrity of what remains.
We engineer decommissioning plans that prioritise lifting safety, control measures, and structural integrity at every step. Starting from your operational constraints and site conditions, we determine the most efficient way to uninstall existing assets—sequencing cuts, isolations, and lifts so that loads are managed, risks are reduced, and adjacent structures remain sound.
Decommissioning engineering with lift safety, control measures, and structural integrity at the core. Sequenced uninstall procedures, temporary works, and compliant documentation for UKCS/North Sea projects.
Site walkdowns, point‑clouds, and as‑built reconciliation to confirm interfaces and access.
COG and mass updates per removal step; connection checks; FEA/hand‑calc verification of remaining members and lift points; stability/sea‑fastening checks where applicable.
Step‑wise plans that coordinate with live operations, weather windows, and permit‑to‑work.
HAZID/HAZOP sessions, task‑level RAMS, and action tracking to closure.
Exclusion zones, tool tethering, lift supervision, trial lifts, and post‑removal inspections.
Concise procedures with checklists, ITPs, hold/witness points, and sign‑off sheets.
Subco delivers high‑quality engineering work, on demand. We help companies deliver critical packages of work—without the delays, overhead, or commitment of hiring. Whether it’s a capacity or capability gap, we provide defined, fixed‑price solutions that keep projects moving.
Discover our platform
Clearly scoped decommissioning tasks, review cycles, and acceptance criteria.
Documentation aligned to relevant regulations and site procedures (e.g., LOLER/PUWER, CDM, waste regulations, class rules where applicable).
Buildable removal steps, temporary works designs, and reinstatement notes.
ISO 9001 quality and ISO 27001 information security; our client portal provides full visibility from scope to delivery.
Rapid site assessment, transparent assumptions, peer review, and sign‑off so projects keep moving.
We deliver removal engineering, reverse installation studies, lift planning, structural assessments for ageing assets, weight management, waste characterisation support, and regulatory documentation — covering topsides, jackets, subsea infrastructure, and pipelines.
Yes. We work across the full spectrum — from complete platform removal and heavy lift engineering to partial decommissioning, such as well abandonment support structures, make-safe modifications, and isolation scope that extends asset life before final removal.
All work is delivered in line with applicable UK and international decommissioning regulations. We produce comparative assessments, environmental impact documentation, and engineering justifications that support decommissioning programme approvals — giving operators a clear audit trail from concept through to execution.
We'll help you define the problem, assess your needs, and connect you with the right engineering expertise — giving you clarity and confidence to move ahead.
Experts
Discover more flexible, fixed-price engineering support in your industry.